Step One Mix epoxy and prepare the liner
   
Step Two Place bladder and liner into place, inflate and allow to dry
   
Step Three Remove bladder and reinstate line, if needed

 

 

 

 

 

 

 


The Cured-In-Place Technology

 

 

Millions of linear feet of cured-in-place materials have been installed worldwide. They have withstood every corrosive environment plus the test of time. Billions of dollars have been saved because excavation was eliminated.

Cured-in-place materials mold to the host pipe. This seamless pipe prevents infiltration and exfiltration, restores structural integrity, eliminates joints that can weaken and allow root intrusion. Cured-in-place pipe actually increases flow capacity because the ACE DuraFlo pipe is much smoother than old clay and concrete pipe. Above ground there are no piles of excavated dirt, no traffic tie-ups, no subcontractors and most importantly, a happy customer.